Menu

TUR-CT Excels in Highly Deviated, Tight Tolerance Liner Cement Job

Centek /25th April 2025/ OFFSHORE

Facing restricted clearances and a highly deviated well (~64° inclination), a Danish operator needed to run an 11 3/4-in liner within a 13 5/8-in casing, with a drift diameter of only 12 1/4 in. Centek proposed a solution using 28 TUR-CT close tolerance flexible centralizers, spaced one per joint, along with 56 slim stop collars, and backed this with torque/drag and fluid dynamics simulations (iCem®) to validate deployment and cement displacement. The liner was run smoothly within predicted parameters, and the cementing achieved excellent zonal isolation—confirmed by pressure and integrity tests—meeting the operator’s objectives and mitigating the risks posed by the tight tolerance and uncertain hole conditions.

The TUR-CT centralizers performed exactly as predicted, enabling smooth liner deployment and delivering an excellent cement job despite the highly deviated, tight-tolerance conditions

THE CHALLENGE

A Danish operator designed a tight tolerance cement job for a high-angle exploration well, requiring an 11 3/4-in. liner to run inside a 13 5/8-in. casing. Challenges included:

  • Restricted clearances: The minimum restriction was 12 3/8 in., with a drift diameter of 12 1/4 in.
  • Complex geometry: The well featured a 14 3/4-in. open hole with a 64° inclination and a total depth (TD) of 10,859 ft.
  • Uncertain hole conditions: After running the liner and beginning circulation, the stability and cleanliness of the hole remained unknown, posing risks for proper mud displacement and cementing.

THE SOLUTION

A total of 28 close tolerance and flexible TUR-CT (11 3/4 in. x 14 3/4 in.) centralizers and 56 slim stop collars (11 3/4 in.) were installed, with one centralizer per joint to optimize standoff and minimize casing drag. Simulations were performed to predict torque and drag forces during liner deployment, ensuring it could be safely run to the target depth without excessive resistance.

A 3D fluid flow simulation was conducted using iCem® Service to model displacement efficiency, ensuring proper mud removal and cement placement. The analysis confirmed that the cement coverage would exceed 80% across the cemented interval, supporting zonal isolation and well integrity.

THE RESULT

The operator successfully mitigated risks, ensured proper liner deployment, and achieved effective zonal isolation and meeting key objectives:

Smooth liner deployment. The liner was run in hole (RIH) within the simulated parameters. No unexpected drag or excessive resistance was encountered, validating the torque and drag analysis.

Effective cementing and well integrity. A successful Formation Integrity Test (FIT), confirmed the cemented interval’s ability to withstand expected downhole pressures. A positive casing pressure test, verifed well integrity and cement bond quality.

Get the complete story

Download Full Case Study
TUR Large Image (1)

Designed for Demanding Close Tolerance Wells

The TUR-CT is a high-performance centralizer specifically designed for the demanding close tolerance (CT) and under-reamed applications found in some of the world’s most challenging offshore fields.

TUR-CT Close Tolerance Under-Ream Bow Spring Centralizer