THE CHALLENGE
The operator needed to run the casing string to total depth in an ERD well in Saudi Arabia, through a 12,216 ft horizontal section.
The inclination at total depth was 89.9°. Measured depth (MD) and true vertical depth (TVD) were 18,122 ft and 4,474 ft, respectively.
THE SOLUTION
Fully heat-treated Centek S2 9 5/8-inch × 12 1/4-inch single-piece centralizers were selected and installed at Centek’s recommended spacing.
The S2 combines strength and flexibility to support casing deployment in challenging wellbores.
THE RESULT
The 9 5/8-inch casing string reached total depth at 18,122 ft MD, including a 12,216 ft horizontal section. The string was then pulled out of hole (POOH) for reasons unrelated to the centralizers.
Across the initial run, withdrawal and subsequent rerun, the centralizers travelled more than 54,000 ft, withstanding the loads encountered during both runs to total depth. Following cementing, the cement bond log (CBL) indicated a good cement job.
The S2’s single-piece construction demonstrated its strength and durability throughout the operation. Although Centek does not recommend reusing centralizers after they have been pulled out of hole, the units in this operation were inspected, found to be undamaged and successfully rerun.