Faced with an unconventional well design — 7″ production casing in a 12.25″ hole to 1,545 m MD at 30° in the Dutch North Sea — the operator found no off-the-shelf centralizers met the required specification. Working closely with Halliburton, Centek engineered, manufactured and tested a 7″ × 12.25″ S2 centralizer within eight weeks under API 10D specifications. Delivered on schedule, the product enabled the casing to be run without restriction or sticking, and the cement job achieved good cement coverage as confirmed by the CBL log. This rapid design-to-market turnaround underscores Centek’s ability to respond swiftly to evolving well-design challenges and deliver fit-for-purpose solutions.

Good decision to use the Centeks. Due to the development costs we had to invest more money, but the job went well and the investment was worth the money.

Drilling Engineer at Wintershall

THE CHALLENGE

To ensure a good cement job in a well with a depth of 1,545mMD, inclination 30 degree and hole size at TD of 12.25”, in the Dutch North Sea, and to maximize core recovery in the chalk reservoir where the reservoir was cored in 12.25”. The production casing run in the section was 7”.

Good centralization and cementation of the 7” production casing in the 12.25” hole was essential to avoid migration of hydrocarbons and problems with the frac treatment in a later stage.

After a review of the market, it was found that no centralizers for 7” casing in a 12.25” hole, with the desired properties, were available.

THE SOLUTION

Centek designed and tested a 7" x 12.25” S2 centralizer within 8 weeks.

THE RESULT

The delivery of the centralizers was within agreed delivery timings, with no delays.

The 7” casing was run without any issues and problems. There were no restrictions observed and no problems getting the casing in the ground. There were also no issues during the cement job.

CBL log showed good cemented casing.

Get the complete story

Download Full Case Study
S2 Thumbnail

Product Used

The revolutionary S2 bow spring centralizer is a high-performance, single-piece solution specifically designed for challenging wellbores.

Its engineered combination of strength and flexibility enhances run-in-hole (RIH) efficiency, reducing time and costs for operators aiming to reach total depth.

S2 Bow Spring Centralizer