In the Yamal region of Russia, a string running 3,685 m in the open hole section to a 6,200 m MD / 2,515 m TVD target encountered previous failures when using a competitor’s bow spring centralizers due to low hook weight. The operator opted to deploy Centek’s S2 centralizers. Simulations confirmed the configuration would succeed despite the low hook weight, and the string was run to TD without delay. This successful run delivered good mud displacement and cement placement around the liner, meeting the critical requirement of ensuring proper cement cover in the casing shoe zone.

Successful running operation achieved to bottom allowing competent cement placement on this critical casing job.

HII, CEMENTING, Casing Equipment, Halliburton

THE CHALLENGE

The string was to be run over 3,685m in the OH section with 75 degree angle to total TD @6,200m MD / 2,515m TVD. The use of a competitor bow centralizers had been problematic as there was not enough hook weight to push the casing string to TD. Previous 9 5/8 job had cost lost time and effort, rig repair, and resulted in a poor cement job. Good cement stone in the casing shoe zone was critical and, therefore, centralization needed to be optimal.

THE SOLUTION

Centek S2 centralizer was used to give the best possible chances of successful RIH and an improved cement job.

Simulations produced for various different conditions and spacing layouts showed that running the string would not be a problem using proposed solution.

THE RESULT

9 5/8 intermediate casing string was run to TD without any problems or lost time. This allowed for good mud displacement and placement of cement around the liner.

Get the complete story

Download Full Case Study
S2 Thumbnail

Product Used

The revolutionary S2 bow spring centralizer is a high-performance, single-piece solution specifically designed for challenging wellbores.

Its engineered combination of strength and flexibility enhances run-in-hole (RIH) efficiency, reducing time and costs for operators aiming to reach total depth.