Centek /21st October 2015/ RE-RUN

A 7″ liner campaign in Egypt experienced repeated failures and a 40 klb liner drop during pull-out of hole (POOH). By deploying the single-piece Centek S2 Bow Spring Centralizer, the operator avoided centralizer junking, eliminated extra fishing operations, and saved 18 rig-hours and nearly USD $20,000 in equipment costs.

Centek S2 Bow Spring Centralizers enabled reuse of a 7" casing string, avoided equipment loss and saved the operator 18 hours of rig time and nearly US $20,000.

THE CHALLENGE

When a 7” string was dropped twice, re-use of Centek Centralizers saved the operator 18 hours rig time, nearly $20,000 (USD) equipment value and secured the well. 

THE SOLUTION

The use of Centek S2 centralizers meant that each time the liner was re-run the centralizers were in good condition. There was no damage from falling off the liner and several RIH and POOH, plus a fishing operation.

THE RESULT

Customer calculated that use of Centek S2 centralizers meant a cost saving of $19,708.00. Minimum rig time was required during fishing and cleanout of hole because of no centralizer junks. This saved 18 hours rig time.

This is compared to the use of normal bow spring centralizers which, the customer felt, would have been more likely to have had to be replaced as they could not have remained intact and could have broken in hole. This may have even led to the loss of the production section of the well.

The Centek S2 single piece construction gives it robustness and strength which exceeds that of many competitor products. Although Centek does not recommend the re-use of centralizers when POOH this case study proves that even when subjected to extreme stresses the unique design of Centek centralizers meant that they remained in good condition and could be used repeatedly.

Get the complete story

Download Full Case Study
S2 Thumbnail

Product Used

The revolutionary S2 bow spring centralizer is a high-performance, single-piece solution specifically designed for challenging wellbores.

Its engineered combination of strength and flexibility enhances run-in-hole (RIH) efficiency, reducing time and costs for operators aiming to reach total depth.

S2 Bow Spring Centralizer